12 research outputs found

    Collaborative scheduling of machining-assembly in complex multiple parallel production lines environment considering kitting constraints

    Get PDF
    In multi-stage machining-assembly production, collaborative scheduling for multiple production lines can effectively improve the execution efficiency of production planning and increase the effective output of the production system. In this paper, a production scheduling mathematical model was constructed for the collaborative scheduling problem of machining-assembly multi-production lines with kitting constraints, with the optimization objectives of minimizing assembly completion time and tardiness time. For the scheduling model, the product assembly process is constrained by the machining sequence of the jobs on the machining lines. Only by collaborating on the production scheduling schemes of the machine line and the assembly line as a whole can the output efficiency of the product on the assembly line be improved. An improved hybrid multi-objective optimization algorithm named SMOEA/D is designed to solve this scheduling model. The algorithm uses adaptive parents’ selection and mutation rate strategies and integrates the Tabu search strategy for the search process in the solution space when the solution of the sub-problem has not been improved after specified search generations, to improve the local search ability and search accuracy of MOEA/D algorithm. To verify the performance of the SMOEA/D algorithm in solving machining-assembly collaborative scheduling problems in production systems with different resource configurations and scales, two sets of numerical experiments were designed, corresponding to situations where the number of operations on each production line is equal or unequal. The running results of the proposed algorithm were compared with three other well-known multi-objective algorithms. The comparison results indicate that the SMOEA/D algorithm is effective and superior for solving such problems

    An efficient production planning approach based demand driven MRP under resource constraints

    Get PDF
    Production plans based on Material Requirement Planning (MRP) frequently fall short in reflecting actual customer demand and coping with demand fluctuations, mainly due to the rising complexity of the production environment and the challenge of making precise predictions. At the same time, MRP is deficient in effective adjustment strategies and has inadequate operability in plan optimization. To address material management challenges in a volatile supply-demand environment, this paper creates a make-to-stock (MTS) material production planning model that is based on customer demand and the demand-driven production planning and control framework. The objective of the model is to optimize material planning output under resource constraints (capacity and storage space constraints) to meet the fluctuating demand of customers. To solve constrained optimization problems, the demand-driven material requirements planning (DDMRP) management concept is integrated with the grey wolf optimization (GWO) algorithm and proposed the DDMRP-GWO algorithm. The proposed DDMRP-GWO algorithm is used to optimize the inventory levels, shortage rates, and production line capacity utilization simultaneously. To validate the effectiveness of the proposed approach, two sets of customer demand data with different levels of volatility are used in experiments. The results demonstrate that the DDMRP-GWO algorithm can optimize the production capacity allocation of different types of parts under the resource constraints, enhance the material supply level, reduce the shortage rate, and maintain a stable production process

    A smart algorithm for multi-criteria optimization of model sequencing problem in assembly lines

    Get PDF
    Assembly Lines (ALs) are used for mass production as they offer lots of advantages over other production systems in terms of lead time and cost. The advent of mass customization has forced the manufacturing industries to update to Mixed-Model Assembly Lines (MMALs) but at the cost of increased complexity. In the real world, industries need to determine the sequence of models based on various conflicting performance measures/criteria. This paper investigates the Multi-Criteria Model Sequencing Problem (MC-MSP) using a modified simulation integrated Smart Multi-Criteria Nawaz, Enscore, and Ham (SMC-NEH) algorithm. To address the multiple criteria, a modified simulation integrated Smart Multi-Criteria Nawaz, Enscore, and Ham (SMC-NEH) algorithm was developed by integrating a priori approach with NEH algorithm. Discrete Event Simulation (DES) was used to evaluate each solution. A mathematical model was developed for three criteria: flow time, makespan and idle time. Further, to validate the effectiveness of the proposed SMC-NEH a case study and Taillard's benchmark instances were solved and a Multi-Criteria Decision-Making (MCDM) analysis was performed to compare the performance of the proposed SMC-NEH algorithm with the traditional NEH algorithm and its variants. The results showed that the proposed SMC-NEH algorithm outperformed the others in optimizing the conflicting multi-criteria problem

    Modeling and Optimization for Multi-Objective Nonidentical Parallel Machining Line Scheduling with a Jumping Process Operation Constraint

    No full text
    This paper investigates the nonidentical parallel production line scheduling problem derived from an axle housing machining workshop of an axle manufacturer. The characteristics of axle housing machining lines are analyzed, and a nonidentical parallel line scheduling model with a jumping process operation (NPPLS-JP), which considers mixed model production, machine eligibility constraints, and fuzzy due dates, is established so as to minimize the makespan and earliness/tardiness penalty cost. While the physical structures of the parallel lines in the NPPLS-JP model are symmetric, the production capacities and process capabilities are asymmetric for different models. Different from the general parallel line scheduling problem, NPPLS-JP allows for a job to transfer to another production line to complete the subsequent operations (i.e., jumping process operations), and the transfer is unidirectional. The significance of the NPPLS-JP model is that it meets the demands of multivariety mixed model production and makes full use of the capacities of parallel production lines. Aiming to solve the NPPLS-JP problem, we propose a hybrid algorithm named the multi-objective grey wolf optimizer based on decomposition (MOGWO/D). This new algorithm combines the GWO with the multi-objective evolutionary algorithm based on decomposition (MOEA/D) to balance the exploration and exploitation abilities of the original MOEA/D. Furthermore, coding and decoding rules are developed according to the features of the NPPLS-JP problem. To evaluate the effectiveness of the proposed MOGWO/D algorithm, a set of instances with different job scales, job types, and production scenarios is designed, and the results are compared with those of three other famous multi-objective optimization algorithms. The experimental results show that the proposed MOGWO/D algorithm exhibits superiority in most instances

    Multi-Objective Material Logistics Planning with Discrete Split Deliveries Using a Hybrid NSGA-II Algorithm

    No full text
    To schedule material supply intelligently and meet the production demand, studies concerning the material logistics planning problem are essential. In this paper, we consider the problem based on the scenario that more than one vehicle may visit each station in batches. The primary objective is to satisfy the demands in the time windows, followed by logistics planning with the minimum vehicles and travel time as the optimization objective. We construct a multi-objective mixed-integer programming model for the scenario of discrete material supply in workshops. First, we propose a hybrid heuristic algorithm combining NSGA-II and variable neighborhood search. This proposed algorithm combines the global search capability of NSGA-II and the strong local search capability, which can balance intensification and diversification well. Second, to maintain the diversity of population, we design the population diversity strategy and various neighborhood operators. We verify the effectiveness of the hybrid algorithm by comparing with other algorithms. To test the validity of the proposed problem, we have carried out research and application in a construction machinery enterprise

    A hybrid fluid master–apprentice evolutionary algorithm for large-scale multiplicity flexible job-shop scheduling with sequence-dependent set-up time

    No full text
    In this article, a large-scale multiplicity flexible job-shop scheduling problem (FJSP) with sequence-dependent set-up time is studied. In this problem, the large production demand for each type of job yields the large-scale multiplicity manufacturing feature. To address the problem, a hybrid fluid master–apprentice evolutionary algorithm (HFMAE) is presented to minimize the makespan. In the first step, a fluid relaxation initialization method (FRI) and an initialize procedure are proposed to obtain high-quality initial solutions. In the FRI, an online fluid tracking policy is presented to improve the assignment decision and the sequencing decision of operations. In the second step, an improved master–apprentice evolutionary method (IMAE) is presented based on the generated initial solutions. In the IMAE, two neighbourhood structures and three makespan estimation approaches are presented to accelerate the solution space search efficiency. Numerical results show that the proposed HFMAE outperforms the comparison algorithms in solving large-scale multiplicity FJSPs.</p